裸体美女黄色小电影|欧美的久久性视频|欧美成人黄色三级特A|自拍国模私拍视频第二页在线|怡红视频一区欧美乱伦电影网|tiantianjiujiu|三级无码电影艹干人妻电影|精品啪啪视频非洲A级片|高清无码日韩中文一区二区|91成人在线草在我视频

2 tunnels dug through in China-Laos Railway construction

Source: Xinhua| 2019-04-15 19:28:29|Editor: zh
Video PlayerClose

LAOS-OUDOMXAY-CHINA-LAOS RAILWAY-TUNNEL CONSTRUCTION

A staff member of China Railway No. 5 Engineering Group stands at the entrance to Nathong No. 2 Tunnel of China-Laos Railway after the tunnel was dug through in Oudomxay Province of Laos, some 400 km north of Lao capital Vientiane, April 15, 2019. Two tunnels of the China-Laos Railway, namely Nathong No. 2 and Nateuy No. 2, were dug through on the same day on Monday by the constructor China Railway No. 5 Engineering Group. (Xinhua/Hu Yong)

   Prev 1 2  

KEY WORDS:
YOU MAY LIKE
EXPLORE XINHUANET
010020070750000000000000011100001379790851